You are here: Home » News » Product News » Construction preparation before welding of large diameter steel pipe

Construction preparation before welding of large diameter steel pipe

Views: 0    

1. Organize relevant operators, be familiar with construction drawings and regulations, formulate welding procedures, and compile welding operation instructions.

2. Welders should be trained in corresponding projects and have operation qualification certificates for corresponding projects.

3. Check whether the roundness and misalignment of the incoming steel pipe meet the relevant technical requirements.

Fourth, check the surface of metal pipe joints for defects such as scars, cracks, and serious corrosion.

5. Before the installation of large-diameter steel pipes, the pipe joints should be measured and numbered one by one.

6. Welding in windy, rainy, and snowy weather There is a wind-proof, rain-proof, and snow-proof shed.

7. Welders should clarify requirements and welding measures before welding.


HOT PRODUCT

QUICK LINKS

CONTACT US

  Hunan Gaoxing Steel Development Zone, No.1888 Purui South Rd, Wangcheng District,Changsha, Hunan, China

Tel: 0086-0731-88739521

  inquiry@threewaysteel.com

Copyright  2020 Threeway Steel Co.,Ltd. All Rights Reserved
PRODUCT INQUIRY